Delivery / Model content

LOD and LOI explained, and how to use them without overpromising

LOD and LOI are shorthand for a simple question: how much can someone rely on this part of the model, and what information does it carry? The labels help only when everyone agrees what they mean.

Guide 10 / About 6 min read / Reviewed November 2026. Independent educational guide; not Autodesk documentation.

The problem these terms solve

A model element can look finished without being reliable. A wall drawn at the right thickness in an early design model looks exactly like a wall whose build-up has been fully specified and coordinated. Someone using the model downstream, a consultant, a contractor or an estimator, cannot tell the difference by looking. LOD and LOI give teams a way to say, element by element and stage by stage, how far the content can be trusted.

Level of development versus level of detail

"LOD" is used with two different meanings, and confusing them causes real disputes.

In North America, LOD usually means level of development, following the approach that originated in AIA contract documents and was elaborated in the BIMForum Level of Development Specification. In the United Kingdom and in ISO 19650 practice, the conversation has moved toward the "level of information need", which covers geometry, alphanumeric information and documentation together. Always check which meaning a contract or BEP uses.

The LOD steps in plain language

Five ascending steps labeled 100, 200, 300, 350 and 400, from concept to fabrication, each with a progressively more detailed element sketch.
Each step adds reliability, and effortSimplified illustration

The commonly used steps for level of development, simplified, are:

Level of development steps (simplified paraphrase)
StepWhat can be relied onTypical use
LOD 100The element exists, perhaps as a symbol or mass. Size, shape and location are not reliable.Early massing and area studies
LOD 200A generic placeholder with approximate size, shape, location and orientation.Schematic design and early coordination
LOD 300Specific size, shape, location and orientation can be measured from the model.Design development and construction documents
LOD 350As LOD 300, plus the interfaces with other systems needed for coordination, such as supports and connections.Detailed trade coordination
LOD 400Enough detail and accuracy for fabrication and installation.Shop drawings and fabrication

LOD 500 is also used by some teams to describe field-verified, as-built content. The BIMForum specification treats field verification as a separate matter rather than a further step of development, so define it explicitly if your project uses the term.

This table is a paraphrase for orientation. For contractual use, refer to the specification edition named in your agreement, which contains element-by-element definitions and examples.

LOI and level of information need

LOI, level of information, describes the non-graphical data attached to an element: type, performance values, manufacturer, classification codes, maintenance information and so on. It grew up in UK practice alongside a geometric level of detail.

ISO 19650 practice uses the broader concept of the level of information need, and the European standard EN 17412-1 sets out a framework for specifying it. The idea is to define, for each purpose and exchange, exactly what geometry, what properties and what documents are needed. Not more, not less. This purpose-led approach is helpful even outside Europe, because it starts from the question "what will someone do with this information?"

Using LOD in a responsibility matrix

LOD becomes useful when it is attached to specific elements, stages and responsible parties. A typical matrix has elements in rows and project stages in columns, with each cell giving the target LOD and the party responsible.

Excerpt from a synthetic responsibility matrix
ElementSchematicDesign developmentConstruction documents
Exterior walls200 / Architect300 / Architect300 / Architect
Structural framing200 / Structural300 / Structural350 / Structural
Ductwork mains100 / Mechanical200 / Mechanical300 / Mechanical
FurnitureNot modeled200 / Interiors200 / Interiors

Notice that targets do not rise uniformly. Furniture may never need more than a placeholder. Structural connections might need LOD 350 only where coordination demands it. Setting every element to a high level by default is the fastest way to create unpriced work.

Specifying information, not just geometry

For each element type that carries data, define:

Keep the list tied to purpose. If nobody downstream uses a parameter, do not require it. If the owner needs asset data at handover, ask early for the exact fields and format; retrofitting data at the end is painful. The IFC export basics guide covers how parameters travel in open exchanges.

Worked example: one wall through three stages

Consider a synthetic exterior wall on a small office project, followed through three stages.

Schematic design, LOD 200. The architect models a generic exterior wall type with an approximate overall thickness. The type name says "Generic" so nobody mistakes it for a decided build-up. Information is minimal: function and a placeholder fire rating field marked "to be confirmed". The structural engineer can use the wall's location to set out a grid, but should not rely on its thickness for anything critical.

Design development, LOD 300. The wall type is replaced with a specific build-up: layers for cladding, cavity, insulation, sheathing and studs, with thicknesses that can be measured from the model. Information grows to include thermal performance targets and the fire rating, each with a named owner. The mechanical engineer can now rely on the wall's position and thickness when locating penetrations.

Construction documents, still LOD 300. Geometry stays at LOD 300, because the architect does not model individual fixings or panel joints; those are covered by drafting details and specifications. What changes is the information: specification references are added, and the type is checked against the wall schedule. A contractor who later needs panel layouts for fabrication would develop that content to LOD 400 in their own model, under their own responsibility.

The example shows two useful habits. First, geometry and information progress separately; a stage can leave one unchanged while the other advances. Second, the type name and parameters signal status honestly at each stage, so nobody downstream mistakes a placeholder for a decision.

What this means in Revit

Common pitfalls

Getting started

If your firm has never used LOD formally, start with one project and a short matrix covering the elements that cause the most coordination questions. Review it at each stage gate and note where targets were too high or too low. Over a few projects you will build a firm default that reflects how you really work.

LOD and information requirements are usually recorded in the BIM execution plan. For firms building their first templates, the Nova strategy packs include planning templates that help make these decisions explicit and owned.

LOD and LOI checklist

Browse all Nova guides

Related products: Model Element Responsibility Matrix (LOD and LOI) and BIM Execution Plan Template for Small Firms (previews; not yet for sale).

About this guide

Original Nova Labs guidance for planning and discussion. Examples are synthetic and contain no measured results or client data. Software behavior varies by release and configuration: confirm it in your installed version and follow your firm's standards, contracts and professional review. Product names belong to their owners; mentioning them does not imply endorsement.