BIM execution plan basics, without the boilerplate

A BIM execution plan records how a project team will produce, share and check information. A good one is short, specific and used. A bad one is long, generic and filed away after kickoff.

Guide 09 / About 6 min read / Reviewed November 2026. Independent educational guide; not Autodesk documentation.

What a BIM execution plan is

A BIM execution plan, usually shortened to BEP, is an agreement among the project team about how information will be produced and exchanged. It answers practical questions: who models what, in which software and version, to what level of detail, on what coordinate system, shared how and how often, and checked by whom.

The BEP is not a contract on its own, but it often sits alongside one, and the client's requirements may make it a contractual deliverable. It is also not a firm's internal standard, although it will reference one. Think of it as the project-specific layer that connects the client's needs to each team's way of working.

Where the BEP fits

Terminology varies by region and framework, but the logic is similar:

In North America, many teams draw on planning guidance such as the BIM Project Execution Planning Guide developed at Penn State, or on templates from industry bodies. Whatever framework you use, read the actual client documents first. A BEP that ignores the contract is worse than no BEP.

The sections most plans need

1. Project information and goals

Basic project data, plus a short list of what BIM is meant to achieve on this project. "Coordinate structure and services before construction" or "provide an asset data set for the owner's facility system" are goals. "Use BIM" is not.

2. BIM uses

The specific uses the team commits to, such as design authoring, coordination, quantity take-off, 4D sequencing or record modeling. Each use implies work, so include only uses that serve a stated goal and that someone has agreed to deliver.

3. Roles and responsibilities

Who is responsible for each model, who coordinates, who manages the shared environment and who approves information for sharing. Use roles, and keep a separate contact list that can change without reissuing the plan.

4. Model breakdown and responsibility matrix

Which party models which elements, at which stage, and to what level of development or information. This is often a table by element and stage. The LOD and LOI guide explains how to fill it in without promising more than you can deliver.

5. Software, versions and formats

The authoring tools and versions each party will use, and the exchange formats. Version alignment matters: mixing major releases of the same authoring tool can block file sharing. State whether exchanges use native files, IFC or both; see the IFC export basics guide.

6. Coordinates, units and levels

The shared coordinate system, survey point and project base point conventions, units, and the source of truth for levels and grids. Mistakes here are among the most disruptive in a federated project, so test them early with a simple exchange.

7. File naming, structure and the shared environment

How files are named, how models are split, where they are stored and how information moves between work-in-progress, shared, published and archived states. If the client specifies a common data environment and naming standard, reference it rather than restating it.

8. Exchange schedule

When models are shared, in what format and to whom. A predictable rhythm, such as weekly coordination exchanges and milestone issues, helps every team plan.

9. Quality checks

What each party checks before sharing: model health, naming, coordinates, required parameters, clash tests. The model health checks guide suggests a practical set.

10. Coordination and issue management

How clashes and issues are identified, recorded, assigned and closed, and how often coordination meetings happen.

11. Deliverables and handover

What is delivered at each stage and at completion: drawings, models, data sets, and their formats. If the owner expects asset data, specify which data, in what structure and who verifies it.

Keep it short and specific

The most common BEP failure is length. Teams copy a large template, fill in the obvious fields and leave generic text everywhere else. Nobody reads it, so nobody follows it. A few habits help:

A simple process to write one

  1. Read the requirements. List every BIM-related obligation in the client documents, with a reference to where it appears.
  2. Hold a short kickoff workshop with each party's BIM lead. Agree goals, uses, responsibility split, software versions and coordinates.
  3. Draft from a lean template. Fill in decisions from the workshop; flag open questions explicitly.
  4. Test the exchange. Before production starts, have each party share a simple model to confirm coordinates, formats and naming actually work.
  5. Agree and issue. Record who approved the plan and when.
  6. Review at stage gates. Update the plan as the project moves through stages and as the team changes.

Keeping the plan alive

A BEP is most useful when the team consults it, which only happens if it stays accurate. Name one person, usually the lead appointed party's information manager or BIM lead, as the owner of the document. Keep a short change log at the front so people can see what changed since they last read it. When a coordination meeting makes a decision that affects the plan, such as a new exchange format or a change of responsibility, update the plan within the week and tell the team.

It also helps to separate stable content from volatile content. Goals, BIM uses and coordinate systems rarely change; contact lists, exchange dates and open questions change often. Keeping volatile items in appendices or linked registers means the core plan does not need reissuing for every update.

BEPs for small projects and small firms

Smaller projects still benefit from a plan, but it can be a few pages. At minimum, record the software and version, the coordinate approach, who models what, the exchange format and rhythm, and what each party checks before sharing. Even a one-page plan prevents the common early surprises: a consultant on a different version, models that do not align, or an owner expecting data nobody planned to provide.

If your firm is setting up its first BEP template, start with the firm-level standards the plan will reference. The BIM standards for small firms guide describes a right-sized starting point.

Common pitfalls

A BEP is easier to write when your firm already has a template, a kickoff checklist and clear ownership of standards. The Nova Foundation pack includes a project kickoff and information checklist designed for that early conversation. It is a planning aid, not a complete project BEP, and it does not replace the client's requirements or professional advice.

BEP checklist

Browse all Nova guides

Related products: BIM Execution Plan Template for Small Firms and Model Element Responsibility Matrix (LOD and LOI) (previews; not yet for sale).

About this guide

Original Nova Labs guidance for planning and discussion. Examples are synthetic and contain no measured results or client data. Software behavior varies by release and configuration: confirm it in your installed version and follow your firm's standards, contracts and professional review. Product names belong to their owners; mentioning them does not imply endorsement.